Office construction at Castle Hills
The Realm at Castle Hills keeps adding office and mixed-use buildings on ground that Lewisville planned as a single district. A Lewisville contractor working there has limited lay-down space, so the unit sits at the fenced construction entrance rather than inside the footprint.
Existing Lewisville tenants and residents stay in occupation while the next building goes up beside them. We agree on the Lewisville placement with the developer first so a service truck never blocks a garage ramp during working hours.
Vista Ridge tenant turnover
Retail and office space around Vista Ridge in Lewisville changes tenants steadily, each turnover bringing demolition and a short fit-out. A Lewisville bay fit-out runs on one standard unit at the rear service area, out of the customer parking that stays in use.
Parking maintenance across those Lewisville properties happens early, with sealcoating and striping crews working before the doors open. The Lewisville service stop gets set before the parking lot begins filling for the trading day.
Corporate Drive fit-outs and grounds work
Office and flex buildings along Corporate Drive in Lewisville turn floors over on long leases, and each change means a full interior fit-out. A Lewisville fit-out keeps its unit at the loading dock where the freight lift and skip already sit.
Landscape and irrigation crews work those Lewisville properties on a rolling route through the warm months. Those Lewisville crews move address to address daily, so one agreed drop point beats following them around the district.
Clay under the Lewisville campus lawns swells and cracks between seasons, so a unit on bare ground drifts off level. Paving or gravel keeps a Lewisville unit square through a long project.
